> For the complete documentation index, see [llms.txt](https://documentation.atempo.com/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://documentation.atempo.com/miria-4.6/admin-guide/migration.md). Agents can also search and read this documentation through its [MCP server](https://documentation.atempo.com/~gitbook/mcp).

# Migration

## Migration Principles

This chapter explains the challenges of a migration project and introduces users to the key features of Miria as a migration solution.

### What is a Migration Project?

A migration project refers to the process of moving data from one environment to another.\
Generally, this migration is required when a system, location or storage provider is changed.\
During the migration, it is important that the company's production is not impacted. Data should be synchronized while the source storage remains in production and production downtime should be minimized.

The duration of a migration project may vary significantly and depends on:

* The size and number of files to migrate.
* The number of modifications on the source storage.
* The time available for production downtime on the source storage during cutover.
* The performance of the infrastructure (source and target storage, network bandwidth, etc.).

### Miria as a Migration Solution

Miria utilizes several key features that enable a seamless transfer of data. All the while\
maintaining timeline requirements, minimizing user impact and ensuring data reliability on all\
transactions. These key features are :

* Optimizing data transfer through job distribution and parallelization.
* Ability to multithread jobs within data movers.
* FastScan technology, which enables quick identification of all object modifications made\
  between two migration synchronizations.
* Incremental and automatic file migrations between heterogeneous storage.
* Iterative migration cycles enabling the source storage to remain operational during the\
  storage migration.
* Automatic object integrity and migrated file access checks.
* Easily adjust performance by adding or removing a data mover.
* Control of the migration project throughout the different steps outlined below.

During the synchronization, Miria constantly checks that the data and metadata read on the\
source storage are exactly written on the target storage using a hash mechanism comparison.

### Migration Steps

A migration project consists of 3 steps:

* **Step 1: First Synchronization:** sets off the initial data transfer and performs a first snapshot of the source. The snapshot is used as a reference point in time. The transfer then copies the source storage data to the target storage.
* **Step 2: Incremental Synchronization :** propagates any modifications made on the source storage (since the previous incremental sync) to the target storage.
* **Step 3: Final Synchronization (Cutover):** completes the data migration to the target storage while the production is halted on the source storage.\
  These steps may happen fairly quickly or take days or even weeks. This depends on the volume of data, customer workflow, testing and timeline for cutover.

## Architecture

This chapter describes the different components of Miria Migration and explains the Snapshot and FastScan technologies.

### Miria Components

The diagram (<mark style="color:blue;">Figure 1</mark>) illustrates the typical migration configuration with all the Miria\
components:

<figure><img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2F2F6bPi1kIJzqBNbs9YUJ%2Fimage.png?alt=media&amp;token=747ddd3f-01b9-41b7-9b57-ed8056324091" alt=""><figcaption><p><strong>Figure 1 :</strong> Miria Migration components in a configuration</p></figcaption></figure>

The infrastructure is composed of the following components:

**Miria Server .**

The Server manages all the data movers and can be installed on a dedicated physical or virtual machine.\
Host Miria's database, which stores:

* Configuration settings.
* Necessary information to perform the various steps of the migration project (snapshots,\
  FastScan, copies on the target storage).
* Report information.

**Agents (Data Movers)**

Miria Agents manage the data movement, acting as data movers. They are key components for the global performance of the migration operation. Data movers must be sized appropriately (network, CPU, and memory).

### Snapshot and FastScan Technologies

#### Snapshot

Snapshot technology is a photograph of a file system taken at a particular point in time (e.g., VSS for Windows). NAS and shared file system snapshots are taken through proprietary API of the specific appliance.

The Snapshot is used at every step of the migration project and freezes a consistent image of the data to transfer.

#### FastScan

FastScan is an option integrated within Isilon, Qumulo, OceanStor, Nutanix NAS and GPFS\
shared file systems.

FastScan enables Miria to optimize the detection of any modifications within a given file system by detecting differences between two snapshots. It then builds a change list that negates the need for scanning or browsing the entire file system looking for any updates and changes. This technology is used when the source storage is still in production during the migration process.

The retrieved list of modifications contains the following information :

* **Created objects**: files, directories, and links.
* **Modified objects.**
* **Deleted objects.**
* **Objects whose type has changed:**
  * A directory has become a file or vice-versa.
  * A directory has become a link or vice-versa.
  * Etc.

The list retrieved by FastScan is then fully scanned to identify the operations to perform (objects to synchronize, objects to delete, modifications to propagate, etc.) on the target storage. The combination of the FastScan followed by a full scan of the file system is useful when a migration project is interrupted. This feature prevents already transferred data to be transferred again when migration resumes.

## Prepare for a Migration Project

Before starting your migration project, it is recommended that you complete the Data Migration Questionnaire. This preparation step will save you time later on.\
The following information is required to complete the questionnaire:

* Project information:
* Company Name.
* Migration Project information: start date, target end date, maximum expected cutover\
  time.
* Customer participants information: name and position, phone number, email address.
* Partner participants information: name and position, phone number, email address.
* Source and Target Storage:
* Brand and model of the Operating system/appliance OS version.
* Number of nodes.
* Data network ports and speed.
* Production state.
* SMB/CIFS and NFS data to migrate:
* Number of shares.
* Total size of data.
* Type of files.
* Number of files.
* Number of directories.
* Average file size.
* Network environment: bandwidth, firewall, port, LACP configuration, MTU Size, etc.
* Migration: Source storage still in production during the migration, performance constraints\
  during the migration, test users to check data access and integrity, etc.
* Applications: Client applications involved in the migration, etc

## Organize and Configure the Migration

This chapter outlines how to organize a project and define the tasks within a migration project.

### Organize Projects

Miria is organized by projects. It is possible to manage multiple projects with different tasks within.

#### Project description

A project allows to group several tasks together to provide global statistics and management on a migration.

Access the **Project Overview** by clicking on a project.

The **Project Overview** enables the ability to :

* See the global progress of a migration project.
* Consult information on the tasks inside the project.
* Create a new task.

#### Task description

Tasks are automatic jobs that can be scheduled or started manually. A task holds the scope of a Miria job and defines the source and target for migration. In general, a project involves several tasks.

Access the Task details by clicking on a task.

The Task details window presents :

* The global progress of a task.
* Information about runs.
* Information about Snapshots.

> **Note**: You can obtain a task report. To do so, click the button of a task run, and select Download report.

### Configure the Migration

Once the infrastructure is configured, you can organize the migration. To start a migration, the first step is to create a project and then a set of tasks.

**Create a New Project**

1. Connect to the Web Interface.
2. In the Migration tab, click New project.
3. Enter the desired project name and click New project Your project is created.

#### Create a Migration Task

**Step 1 : Select a source and a target platforms**

1. In the Web Interface, click the **Migration** tab to open the list of migration projects.
2. Click the <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FSDlpKan45xeiOLNOEHeu%2Fimage.png?alt=media&amp;token=841476d7-de08-4c5c-babf-a21768722067" alt="" data-size="line"> icon on the far-right side of the project for which you want to create a task, then click **+ New task.**

   You can also click on <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FWzCh4amVmiXckesuXb8n%2Fimage.png?alt=media&amp;token=2b05e83a-7953-4415-8c3e-3c0bd696ea54" alt="" data-size="line"> the project name, click on the icon in the upper-right corner of the screen, then click **+ New task**.
3. Select a source and a target. Once the migration is finished, the target platform takes over the data protection role. For example, the target platform can be a server, NAS, shared file system, or cloud.
4. Click **Next**.

**Step 2: Choose the directoriess to migrate**

1. Specify the directory you want to migrate and the target platform. You can perform various operations by clicking the icon <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FJJIEvZw0CliVpcRj7pRv%2Fimage.png?alt=media&amp;token=e2a2987b-a098-4d54-87d1-f576f4e093c3" alt="" data-size="line"> on the far-right side of each directory: For instance, you can add a directory within an existing directory or rename a directory. The same is possible for the storage destination.

   > **Important**: Copying objects with identical names but different content to the target platform may cause data overwriting (if you move directories including files with identical names but different content, for instance). You can use one of the following methods to choose any directory-destination storage combination:

   **Method 1 :**

   Drag the directory you want to migrate from the source platform to the target platform.

   **Method 2 :**

   Browse the file tree of the source platform and select the directory you want to migrate.

   1. Browse the file tree of the target platform and select a destination directory.
   2. Click **+ Add** to view your selection.
2. Repeat this process for any additional source and target paths of directories that require migration.

   **Or** Click the<img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FJTWYq7Ng6ihktCi4h6pB%2Fimage.png?alt=media&amp;token=ed34c818-29e2-4e4d-9627-376feffc3812" alt="" data-size="line"> button next to **Your selection** to directly add or edit the global paths of the directories to migrate and their corresponding targets.
3. Choose the files and directories that must be included or excluded.
4. Click **Next**.

**Step 4: Set additional options**

1. Select the synchronization type required for the workflow: As Settings, Echo, Subscribe, Contribute, Combine.
2. Set snapshot options. A snapshot is the state of a file system at a particular point in time.
   1. **Snapshot**. A snapshot of the source directory is taken at the start of the task. This snapshot is then used as the synchronization reference. Any modifications made by the users on the source directory do not impact the synchronization process. The snapshot is used by the current task, and is deleted at the end of the task.
   2. **FastScan**. The snapshot includes the Snapshot and FastScan features. The snapshot is not deleted at the end of the task. It is used by the next task to determine the objects that have changed, and must be archived. You can also validate tasks, even if jobs are terminated on a warning.
3. (Optional) Set your scheduling options:
   1. Activate scheduling options.
   2. Select the days of the week when automatic tasks must be started as well as a frequency.
   3. Set a time at which automatic tasks must be run. You can set a time in hours and minutes, or set a time in hours and automatically run the task every 5 minutes.
4. To split the current task into multiple tasks, enable **Split tasks.**
5. To activate the multithreading feature, enable Thread and enter a numerical value from 1 to 128. This parameter sets the maximum number of parallel input / output streams. The higher its value, the better the performance of the source pool when transferring data. The thread value can be changed while the task is running. The new value will be effective on all upcoming jobs associated with the task. The optimum value for the number of threads parameter depends on the number of cores available to each of the Data Movers that make up the source platform pool. To calculate this value, divide by 2 the number of cores of Data Movers that are part of the pool. >

> **Example**: For a pool where each Data Mover has 8 cores, set this value to 4. For a pool where the number of cores is different between Data Movers, divide by 2 the number of cores of the Data Mover with the smallest number of cores. If one of the Data Movers has 16 cores and another has 32, set this value to 8. The recommended value here is the number of Data Mover cores divided by two.

6. (Optional) To parallelize jobs, activate **Jobs Parallelization.** This option enables Miria to accelerate data movements. This is useful for large volumes of data as it allows, for example, the ability to write several files simultaneously on the target file system. By default, the task :
   1. Scans the entire storage to identify the items to be migrated, lists them, and creates a selection of the files.
   2. Cannot trigger the migration job until the selection step is complete. A storage scan\
      can be time-consuming if the number of files to be migrated is very high and / or if the deduplication is activated. Using job parallelization changes the default behavior.\
      The job parallelization value can be changed while the task is running. The new value will be effective on all upcoming jobs associated with the task.
7. When job parallelism is enabled, set a value for :
   1. The maximum number of simultaneous parallel jobs: in general, 2 times the number of Data Movers that make up the platform pool.
   2. At least one of the following thresholds used to trigger a job :
      1. The number of minutes you want before starting a new job.
      2. The maximum volume in GB you want before starting a new job. The default value is 1024 GB.
      3. The maximum number of files you want before starting a new job. The default value is 250,000 files. To set only one of the limits (time, size, or number of files), enter 0 in the fields that the synchronization task should ignore. You must define at least one of the three fields.

> **Note**: Each of these limits define when a new job will be started. The selection operation continues in parallel with the copy job until the defined limit is reached again, which in turn will cause a new copy job. This continues until you reach the maximum number of parallel copies allowed. The limitation(s) on file selection should be sufficient so that the job can select enough files, but not too much to prevent the Data Mover from being idle when selecting files. Experience determines the best compromise between these priorities. Three limits are considered during the synchronization job. They are presented in the following order:
>
> 1. Volume of the selection.
> 2. Number of files in the selection.
> 3. Time: Time: even if the selection has not reached the selected volume or number, the copy job is triggered at the end of the set time.

8. Choose the copy mode, the following options are available to copy data :
   1. Copy symbolic links.
   2. Copies symbolic links as symbolic links at destination. When unchecked, targets of symbolic links are copied at destination.
   3. Copy hard links. (Only on Linux/Unix over NFS) The hard link structure on the source is preserved and rebuilt at the destination location.
   4. Copy immutability configuration. Retains immutability mode and its settings/retention during a compatible S3-to-S3 migration. Everything including Legal Hold flag is replicated.

      > **Important**: This option is available only if the bucket at destination is already locked. Otherwise, the information will not be copied.
   5. Copy NFS v4.2+ extended attributes collects extended attributes when using v4.2 or higher versions of the NFS protocol with Data Movers.

**Or**

* Alternate data streams (ADS).

9\. Select an option in the Permissions Management section:

* Same as source. The permissions assigned to the objects at destination are the same as the permissions that were assigned at source.

> **Note**: If the task is cross-platform (Windows to Linux, for example), this setting will have the same behavior as Force unrestricted permissions.

* Inherited from target. The objects at destination inherit permissions from their parent directory. This occurs if those parent directories have the appropriate ACLs.
* Force unrestricted permissions. All objects in the destination are accessible to any user, without any restriction. For example: On Linux: the owner, the groups to which the owner belongs, and anyone else, has the RWX (Read, Write, Execute) rights. With these rights, everyone can edit or delete the objects in the destination. On Windows: everyone has the rights, and can edit or delete the objects in the destination.

10. To check migration integrity, select a hash algorithm. An integrity check is possible in both normal and cut-over mode and enables monitoring and producing reports on the migration task.
11. (Optional) Configure custom settings for the job associated with the task: a. Enable the Commands option. b. Enter pre-processing or post-processing commands to customize the job.
12. (Optional) Adjust run options to associate the task with other tasks: a. Select a timeframe, a lock and the task that must be run when the task is over. b. Enter a maximum number of simultaneous runs. You can also pause the task when the maximum number of simultaneous runs is reached.
13. Click **Next**.

**Step 5: Summary**

1. Read the **Summary of the task.**
2. Enter a name for the task.
3. Associate the task to a project.
4. Click **Create**

#### Edit a Project

1. Click the **Migration tab**, then the <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FCCNB3M5iKgv7ywYyNQ6o%2Fimage.png?alt=media&amp;token=b0d0b898-0556-4efa-8878-ec3da71fea62" alt="" data-size="line"> button in a project.
2. Click **Edit project.**
3. Enter a new name for the project.
4. Click **Update**.

#### Edit a Task

1. Click the **Migration** tab, then select a project.
2. In the **Project overview**, select a task and click the <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FGUk8nAHGq1fPmsWReLGL%2Fimage.png?alt=media&amp;token=5da74310-faf2-4674-bb49-0bfa8ec98659" alt="" data-size="line"> button.
3. Select **Edit task.** The task configuration wizard is displayed.
4. Modify the section(s) you want to edit and click **Update** to save changes.

#### Start Migration Task(s)

A project may consist of multiple tasks. Miria provides the ability to start all tasks at the same time or to start tasks independently.

**Start an individual task**

1. Select the project.
2. In the **Tasks section**, click the button of a task.
3. Choose one of the following options:
   1. Start task.
   2. Start task in Test Mode.
   3. Start task with Pre-Cutover.

**Start all tasks**

1. Select the project.
2. In the upper right corner, click Start and choose:
   1. Start all tasks.
   2. Start all tasks in test mode.
   3. Start all tasks with pre-cutover.

#### Duplicate a Task

1. Click the **Migration tab**, then select a project.
2. In the **Project overview,** select a task and click <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FjSkcWYJEBv2FmRFvAAz6%2Fimage.png?alt=media&amp;token=e3b67198-9579-4c6b-96e6-86f13b96d1c4" alt="" data-size="line"> the button.
3. Select **Duplicate task.**
4. Enter the name of the task to be duplicated.
5. Click **OK**. The new task is created within the project.

#### Disable a Project or a Task

1. Click the **Migration** tab :
   1. • Click the <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FPdn5Cxo2lyU0Ows0nR8I%2Fimage.png?alt=media&amp;token=090cd13c-6f2f-49a2-96e5-d9679e27f081" alt="" data-size="line"> button in a project and select **Disable.**

      **Or**
   2. Select a project, then click the <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FPdn5Cxo2lyU0Ows0nR8I%2Fimage.png?alt=media&amp;token=090cd13c-6f2f-49a2-96e5-d9679e27f081" alt="" data-size="line"> button in a task and select **Disable**.
2. Click the **Settings tab,** then **Hidden projects and tasks** to locate and restore disabled projects and tasks.

## <mark style="color:$primary;">Manage the Migration</mark>

This chapter lists the 3 steps of a migration project. To manage a migration, tasks must be started at each step of the migration project :

* If a task is scheduled, it will start automatically.
* If a task is not scheduled, the task will need to be run. See [<mark style="color:blue;">Start Migration Task(s).</mark>](#start-migration-task-s)

### Step 1: First Synchronization

The first step in a migration project consists of synchronizing the initial transfer of data between the source storage and the target.\
Before starting the synchronization, define the user workflows on the source storage and the target storage during the data migration.

* If production on the target storage is halted, the task can start in Echo mode.
* If production on the target storage starts immediately, it is recommended to use\
  **Contribute** mode.

The synchronization will behave differently depending on whether snapshot is enabled or not.

**With Snapshot:**

1. Miria will make a reference snapshot of the source storage (Figure 10).
2. Perform a full scan of the snapshot to validate it.
3. Synchronize data from the source to the target storage.

   <figure><img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FIJkVbWPpro0J97cTNZfu%2Fimage.png?alt=media&amp;token=b66bca90-5351-4da9-ab16-5f127b989bb3" alt="" width="563"><figcaption><p><strong>Figure 2</strong> : Diagram of a reference snapshot from a source to a target storage</p></figcaption></figure>

**Without Snapshot:**

If snapshot is not available on the source storage:

1. Scan the entire file system.
2. Synchronize data to the target storage. The first synchronization without a snapshot can take days/weeks depending on the volume, size and number of files.

When performing the first synchronization with or without snapshot, it is recommended to split the file system by path on several tasks. This enables to scan the file system in parallel.

**To start the first synchronization:**

1. Open the project or the task you want to migrate.
2. Click [<mark style="color:blue;">Start Migration Task(s).</mark>](#start-migration-task-s)
3. Click the Activity tab to verify the job progress.

### Step 2: Incremental Synchronization

The incremental synchronization is the process of running a task to migrate daily updates or changes since the first synchronization task was run (<mark style="color:blue;">Figure 11</mark>). It can take several days or weeks depending on your data volume.

**With Snapshot:**

Each synchronization follows 5 sequential stages:

1. Second snapshot of the source storage.
2. FastScan retrieves the list of objects that have been modified since the previous snapshot.
3. Miria validates the list returned by FastScan through comparison between source and target storage. Miria Migration produces a change list.
4. Detected modifications are propagated (creation, deletion in Echo mode, etc.) to the target storage.
5. If the synchronization is successful, the previous snapshot is deleted and the current snapshot will be the reference point for the next task.

> **Note**: Adding additional data movers will reduce the time needed for migration.

These incremental synchronizations enable the operations to converge towards the final\
synchronization.

With FastScan: Scanning begins:

1. First run :
   1. If parallelization rules are set :
      1. Miria scans until triggering the parallelization rules defined, and spawns a new copy, sync, archive, or backup job.
      2. The scan keeps going until triggering once again the parallelization rules, and so on till the maximum parallel jobs defined into the task definition are triggered.
   2. If no parallelization rules are defined :
      1. All of the source platform is scanned.
      2. Once the scanning is over, the data movement is initiated.
2. FastScan incremental runs :
   1. Changes list are consolidated against source storage API.
   2. Miria scans against this change list.
   3. If parallelization rules are set :
      1. Miria scans until triggering the parallelization rules defined and spawns a new copy, sync, archive, or backup job.
      2. The scan keeps going until triggering a new time the parallelization rules, and so on till the maximum parallel jobs defined into the task definition are triggered.
   4. If no parallelization rules are set :
      1. Miria scans all.
      2. Once scanning is over, the data movement is initiated.

**To manage the incremental synchronization:**

1. Open the project or the task you already run in the [<mark style="color:blue;">Step 1: First Synchronization.</mark>](#step-1-first-synchronization)
2. Click [<mark style="color:blue;">Start Migration Task(s).</mark>](#start-migration-task-s)
3. Click the **Activity** tab to verify the job progress.
4. Start the tasks as many times as necessary.

### Step 3: Final Synchronization (Cutover)

The final synchronization is performed to complete the data migration to the target storage while the production is stopped on the source storage (<mark style="color:blue;">Figure 3</mark>). It ensures that the source and target storage are fully synchronized. During the final synchronization, Miria does a full scan of the reference snapshot without creating or deleting one.

The final synchronization task is supported only in Echo mode. When launching the task, all new data on the target storage (which does not exist on the source storage) will be deleted.

> **Note**: During the final synchronization, the source storage must be on read-only mode in accordance with the customer's constraints. This should have been predefined in the preparation and planning phase and the Statement of Work.

Cutover times are dependent on the size of the data sets being migrated and the daily change rate.

<figure><img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FY9EmBdH1zqBgaRz5uwyb%2Fimage.png?alt=media&amp;token=b0313b23-ad30-44d5-83cf-f36bfcfc77b0" alt="" width="563"><figcaption><p><strong>Figure 3</strong> : Final synchronization process</p></figcaption></figure>

**Step 1: Start the final synchronization**

1. Stop production on the source storage or set to read only.
2. Open the project or the task you have already run.
3. Click the <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FOwOYlrByVx9r23sooLyU%2Fimage.png?alt=media&amp;token=74eb47a8-7ece-4dbb-af3b-6ee680d7deb4" alt="" data-size="line"> button of a task.
4. Select **Start task with Pre-Cutover.**

Once the data on the target storage is fully synchronized, proceed with the copy of the ACLs and alternate streams in the next step. This allows to :

* Replicate the rights and permissions on the source storage.
* Restore the modification dates of the folders on the target storage.

**Step 2: Copy permissions and alternate streams**

1. Select the task for which the data synchronization is run and click the button <img src="https://2203078701-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2Fw5h0P6nnTAuQFNt2ofjn%2Fuploads%2FOwOYlrByVx9r23sooLyU%2Fimage.png?alt=media&amp;token=74eb47a8-7ece-4dbb-af3b-6ee680d7deb4" alt="" data-size="line">.
2. Select **Edit task**.
3. In the Task creation wizard, click **Next** until the task options are displayed.
4. In the **Copy mode** section, select the option to copy only alternate data streams (ADS).


---

# Agent Instructions
This documentation is published with GitBook. GitBook is the documentation platform designed so that both humans and AI agents can read, navigate, and reason over technical content effectively. Learn more at gitbook.com.

## Querying This Documentation
If you need additional information that is not directly available in this page, you can query the documentation by asking a question.

Perform an HTTP GET request on the following URL with the `ask` and `goal` query parameters:

```
GET https://documentation.atempo.com/miria-4.6/admin-guide/migration.md?ask=<question>&goal=<user_goal>
```

`ask` is the immediate question: it should be specific, self-contained, and written in natural language.
`goal` is what the user is ultimately trying to achieve, the reason they need the answer. Sharing it helps GitBook give you a better, more relevant answer. A goal is most helpful when it describes the outcome the user wants rather than restating the question. For example, with `ask=how do I create an API token`, a goal like `automate deployments from our CI pipeline` lets GitBook tailor the answer to that use case.

The response will contain a direct answer to the question and relevant excerpts and sources from the documentation.

Use this mechanism when the answer is not explicitly present in the current page, you need clarification or additional context, or you want to retrieve related documentation sections.
